What is the wiring sequence between the controller and motor drive?

Following Vehicles

Answer

CH2 controls the left wheel and CH3 the right. Connect black GND to GND, red 5V to 5V and yellow PWM to the signal input. Verify the connector and wire colors before connection.

Installation and deployment

Where should I connect the vehicle battery cable?

Following Vehicles

Answer

Connect the battery positive lead to the motor controller's power input through the 2P quick connector. The source recommends a physical switch in the positive supply circuit for emergency power isolation. Verify wiring against the applicable installation guide.

Installation and deployment

How should the motors and wheels be secured?

Following Vehicles

Answer

Fit the square key into the motor-shaft and wheel-hub keyways. Then install the flat washer, spring washer and M8 bolt. Without the key, the wheel can slip on the shaft.

Installation and deployment

How are the ultrasonic sensors wired?

Automatic Following Kits, Following Vehicles

Answer

Connect them to the controller slots in left, front-left, front-right and right order. Suitable extension cables may be used.

Installation and deployment

How are the PDoA anchors connected?

Automatic Following Kits, Following Vehicles

Answer

Use the specified 1.25mm-pitch 4P cables for the master/slave anchor connections. The rear-anchor cable can be extended as specified by the installation guide.

Installation and deployment

How are motors connected to the motor controller?

Automatic Following Kits, Following Vehicles

Answer

Connect the black 4P motor plugs to M1/M2. The referenced two-wheel setup has no front/rear motor pairing; the four-wheel setup connects the left and right motor groups as specified in the wiring diagram.

Installation and deployment

How are controller wheel outputs wired?

Automatic Following Kits, Following Vehicles

Answer

Connect CH2 for the left wheel and CH3 for the right through the specified 3P cables: black GND, red 5V and yellow PWM.

Installation and deployment

What are the drive-wheel installation steps?

Automatic Following Kits, Following Vehicles

Answer

Insert the motor shaft into the drive wheel, fit the square key, secure with the M8 bolt and inflate the tire.

Installation and deployment

How is a motor secured to the chassis?

Automatic Following Kits, Following Vehicles

Answer

Use four M6 Γ— 40 screws for the referenced mounting.

Installation and deployment

How should the casters be installed?

Automatic Following Kits, Following Vehicles

Answer

Fit the bearing assembly onto the 30mm tube, tighten the bolt and adjust the ground clearance so all four wheels contact the ground.

Installation and deployment

Which direction should the anchors face?

Automatic Following Kits, Following Vehicles

Answer

Face the indicator side of both front and rear anchors outward.

Installation and deployment

Where should front and rear anchors be mounted?

Automatic Following Kits, Following Vehicles

Answer

Mount each at the center of its corresponding end, with the indicator side outward and cable port inward. The referenced guide gives approximately 0.5m above ground and a 15Β° installation angle. Confirm the orientation in the exact guide.